41
42 Lower is primed.
43 Head sanded.
44 Head repainted.
45 Lower sanded.
46 Lower refinished.
47 Head is ready to screen.
48 Warning text screened.
49 Cabinet has been prepped,braided and decaled.
50
51 Edges are finished.
52 Reassembly is next.
53 TAF is a tough rebuild playfield wise since it has 5 jets,4 flippers erc. so I will rebuild the playfield while building t
54 First step is t nutting.
55 T nutted.
56 Through parts are being installed.The rails are new (Thanks Taylor).
57
58 Top is populated far enough for now.
59 Wiring and underside rebuild begins.
60 All targets and switches will be replaced.The replacement targets are reinforced for the high traffic areas.
61 All coils were replaced and the mechs were polished and rebuilt.
62 All flipper parts are new.
63
64
65 Switch harness is roughed in.All the new targets have been soldered in place and in the process the factory daisy chains w
66 Lamp harness roughed in.
67 The bookcase assembly needs to be cleaned and rebuilt.
68 Bookcase rebuilt ready for install.
69
70 The thing hand assembly is rebuilt and in place as well.The LED conversion was done to the feature lamps and the coil harne
71 Wiring of the underside is nearly complete.
72 Topside population and rebuild continues.TAF is one of the few games I prefer to complete the playfield on almost entirely
73
74
75
76 Topside rebuild is almost complete.
77
78
79
80 New plastics installed.The condition of the thing box cosmetically was not perfect so I used the supplied decal for it.