81
Replaced.
I won't bother documenting every single one but this is done to all the switches and feature lamps.
|
82
As previously noted all coils are rebuilt including the flippers with the correct kits and new coils.
|
83
The sling style links were replaced with the more durable stern style links(blue).
|
84
Switch harness has been rebuilt and is in place.
|
85
A new stainless whirlpool popper is being installed from Mantis.
|
86
All wiring and mechs are in place.
A bit of wire routing/clean up is still needed then the playfield is ready to flip ag
|
87
Resting brackets were plated playfield is ready to go into the cabinet.
|
88
Cabinet rebuild is complete.
|
89
All the rust,corrosion and wiring hacks have been fixed.
|
90
All boards have been serviced.
|
91
Playfield is back in the cabinet.
|
92
Powered up for testing.
|
93
DMD has a line out in the far right so it will be replaced.
The actual panel is apart right now for cleaning ang polishi
|
94
|
95
|
96
The post behind the lower jet is left off on purpose for better play.I did not fill the hole since this area is unseen but
|
97
|
98
|
99
DMD plastic has been washed then buffed and reglued to the panel.
|
100
All other parts to the panel were cleaned,polished and refinished as needed.New DMD is installed.
|
101
Lamp panel was torn down,clean and refinished.All new bulbs were installed as well as new tags and a the connector was reb
|
102
Lamp and DMD panel are reinstalled.
|
103
|
104
new plastic set will be installed.
|
105
New boulders there are being changed over with blue domes and a clear one on the back side to make it a little more fitti
|
106
All the ramps are being replaced but they will be fit one at a time and beveled/adjusted as needed to make surethe ball fl
|
107
New stainless flaps will be installed during the ramp fitting process.
|
108
First ramp is fit and installed.
|
109
New boulders are in place as far as the lower goes until installing the upper.
|
110
Upper is being rebuilt.
|
111
Bigfoot needs a bath and to be rebuilt.
|
112
Torn down.
|
113
Corrosion.
|
114
Cleaned up.
|
115
Rebuilt ready to go on the upper.
|
116
Upper playfield is rebuilt and set in place.
|
117
|
118
|
119
Swapping,fitting and installing all of the ramps is a very time consuming job and part of what makes WH2O a pretty tough
|
120
Final ramp has been fit,updated to stainless flaps and installed.
|