41 That should be all the clear application needed to get the playfield in order.
42 Cabinet is ready to strip and begin the repair process.
43 Cabinet is stripped.
44 Head stripped.
45 I will fill the seams and gaps.
46 Seams and gaps filled.
47 I will do the face of the head as well.
48 Lower is being repaired,holes filled etc.
49
50
51 Floor sanded clean.
52 Cabinet repairs are complete.
53 Factory flaw in the head is also repaired.
54 Cabinet is primed.
55 Cabinet guide coated.Will be ready to sand and paint next.
56 Translite panel is torn down for restoration.
57 The tub portion will be plastic etched and refinished.
58 Tub refinished.
59 Wiring cleaned and the panel is rebuilt.
60 Cabinet is sanded and ready to paint.
61 Cabinet based in black.
62 Cabinet is cleared.
63 Head cleared.
64 While the cabinet dries I will move on to other aspects.First will be swapping all the red LEDs for gren in the mothershi
65 Green LEDs installed.
66 Playfield is sanded and ready to polish.
67 Playfield polished.
68 Outside pics of the playfield.I was doing some others so why not?.
69 Shooter lane.
70
71
72
73 Missing detail added at the jackpot insert.
74
75 Ready for rebuild.
76 Rebuild in process.
77 Through parts installed.
78
79 Underside rebuild begins.
80 Cabinet is braided.