81
Lamp harness roughed in.
|
82
Decal edges finished out.
|
83
Head on lower.
|
84
New rails installed.
|
85
Just a couples days away at this point.
|
86
Cabinet is wired.
|
87
|
88
Up on legs ready for the playfield which is nearly ready to drop in.
|
89
Playfield is now in the cabinet.
|
90
|
91
|
92
DMD panel polished and rebuilt.Lamp panel refinished and installed.Powered up for testing.
|
93
Trim is installed.This was color matched to the cabi net for a cleaner look.
|
94
Upper playfield is in place.
|
95
|
96
|
97
Game is pretty much done now.Waiting on some blue flipper rubber should be here in the morning.
|
98
Missing boulder in place.All new ramps installed.
|
99
|
100
|