160
New cabinet and head are being prepped.
|
161
Cabinet is primed and guidecoated.
|
162
Cabinet is sanded and ready to paint.
|
163
Cabinet is based in blue.
|
164
Cabinet is cleared.
|
165
|
166
Clear is wet and glossy right now but will dry down to a more correct matte finish after and overnight cure.
|
167
Cabinet has dried overnight and now is at the correct gloss level.
|
168
Head is being screened with the correct System 11 style screen.
|
169
Head screened.
|
170
Cabinet is now ready to prep for decal applcation.
|
171
Cabinet is braided and decaled.
|
172
|
173
Will finish the edges next and begin the rebuild.
|
174
All boards serviced.
|
175
Head is built and installed.
|
176
New rails etc.
|
177
Edges finished out.
|
178
Interior parts plated,polished or replaced as needed.
|
179
Front decal is properly centered.
|
180
Cabinet rebuild nearly complete.
|
181
Cabinet is being wired.
|
182
All wiring neatly routed.Not easy on these System 11 games.
|
183
Other plated and polished parts installed.
|
184
New coin door skin(correct one)coin door was rebuilt and rewired to eliminate hacks.
|
185
Refinished lame panel installed.
|
186
Playfield is t nutted.
|
187
|
188
|
189
Through parts installed.
|
190
Bumper bodies etc installed.Six of them.
|
191
|
192
|
193
|
194
Underside rebuild in process.
|
195
Apron is being redone.
|
196
|
197
|
198
|
199
|