41
Lower sanded.
|
42
Lower refinished.
|
43
|
44
Warning text screened.
|
45
Since MM needs modification to use a sub woofer I have routed the floor out to fit the larger speaker.
|
46
Skipping ahead a little the cabinet has been detailed,prepped,braided and decaled.This MM as is typical with most of them
|
47
Decals are applied all the way around.
|
48
Edge finishing and rebuild will be next.
|
49
Edges are finished.
|
50
|
51
Head rebuilt.
|
52
Lower being rebuilt.
|
53
|
54
|
55
Playfield rebuild in process.
|
56
Through parts installed.
|
57
|
58
|
59
|
60
Underside rebuild in process.
|
61
New stainless Mantis weldments are used for the popper and merlin scoop.
|
62
trolls are rebuilt with new switches as well as LED fitted heads.
|
63
The entire switch harness is rebuilt with all new roll over and sling switches.The coil assemblies were polished and rebuil
|
64
Underside rebuild nearing completion.
|
65
Underside rebuild complete.
|
66
|
67
Playfield is back in the cabinet.
|
68
Powered up for testing.
|
69
|
70
Game is finished.The following pics are not that great since the game is being delivered in person and documentation isn't
|
71
|
72
|
73
|
74
|
75
|
76
|