1 Teardown underway.
2
3 Rare L.S top coat playfield.Game is a prototype.
4 Cabinet racked and seperated.
5 At the top as well.
6 Cabinet nearly stripped completely.
7
8 Inside right rear is seperated badly also.Entire cabinet will need to be resquared,brad nailed and glued back together.
9
10
11 Decals will have to be completely removed back down to the wood.
12
13
14 Playfield is being stripped.
15
16
17 Has a few bad touch ups.
18 All colors are showing signs of vertical cracking.
19 Some wear at the holes.
20
21
22 Here is a close up to give an idea of the degree of vertical cracking.Basically it is the entire playfield and without the
23
24 Here is the jet bumper area with the poorly done touch ups wiped away.
25 Here is a little more wear.
26 An intial coat of clear has been put down in an effort to seal the playfield up and start filing the grain prior to beginin
27
28
29
30
31 This picture shows what we are dealing with.There is no way to eliminate all the vertical craking in each and every color.T
32 Intial coat of clear is sanded.Low spots are being filled in.
33
34
35
36 Time to strip the cabinet.
37
38
39 Ready to start the repairs.
40 First color to be repainted is the red.