41
Some of the cabinet parts as removed.w
|
42
Cabinet parts after a thorough rework and regraining process.
|
43
Cabinet wiring and parts cleaned and bagged.
|
44
Coindoor is nice structurally just needs to be restored.
|
45
Broken down for cleaning and refinishing.
|
46
The slot housing was rougher than the skin so it was stripped.
|
47
Door has been refinished with the correct texture and speckling then rebuilt.
|
48
Ready to begin the cabinet strip/repair process.
|
49
Cabinet is stripped to bare wood.It is not a bad cabinet but has the typical trenches where the legs have dug in.System 11
|
51
The cocktail of resin,carbon filler and hardner. A combination of carbon fiber filler and fiberglass resin is used to make
|
53
Mixture applied to trouble spots and corners to make the cabinet more like one solid part than several parts joined togeth
|
54
Repairs complete.Lower is ready to prime.
|
55
|
56
Lower is primed.
|
57
Head is ready to beging repair process.
|
58
Stripped down to bare wood all the way around.Back will need to be completely redone with new text as well..
|
59
Repairs in process.Same methods as used on the lower to rebuild corners etc.
|
60
Repairs complete ready to prime.
|
61
Head is primed.
|
62
Primer is dry.Guide coat applied prior to sanding.
|
63
Cabinet is sanded and ready to refinish.
|
64
Cabinet is refinished in the base color.
|
65
|
66
Cabinet is ready to decal now that it has been braided.
|
67
|
68
Decals are applied and finished.
|
69
|
70
Ready to begin the rebuild process.
|
71
The playfield is NOS but since it is your typical System 11 it had some insert issues.
|
72
The inserts with questionable text have been stripped.The playfield has also been cleared at this point and sanded to g
|
73
|
74
New text has been applied to the inserts as needed.
|
75
A mid coat of clear has been applied to seal the playfield and further level it.
|
76
|
77
Playfield has been sanded level and cleared for a final time.
|
78
|
79
Ready for reassembly starting with new t nuts.
|
80
Playfield rebuild in process.
|
81
Back to the cabinet for now since a built playfield will do no good without a place to put it.
Head is rebuilt.
|
82
Head is back on lower.New siderails were installed.
|