41
Primed.
|
42
|
43
|
44
Guidecoated.Once this cures I will sand it and begin the painting process.
|
45
The original head and cabinet are beginning the teardown and restoration process.What this means is each part I take off wil
|
46
Original lamp panel removed.
|
47
This will need a lot of work even though it is being replaced.
|
48
the main work will be rebuilding every single connector and the associate wiring.
|
49
This is the newly made replacement panel.
|
50
All new sockets are in place.The wiring will need to be soldered on once cleaned and rebuilt.
|
51
Back to the cabinet.It is sanded and ready to begin painting.
|
52
|
53
Based in white.
|
54
Orange is done.
|
55
|
56
Black work is done.
|
57
|
58
|
59
|
60
Cleared.
|
61
|
62
|
63
Glossy in the pictures right now but will dry down to a more correct matte or semi gloss overnight.
|
64
|
65
I painted a new spare set of legs to match.Might work well might not but it will just be an option and needed to be done al
|
66
|
67
Cabinet is sanded and minor corrections to the art have been made as needed.
|
68
|
69
Masked and ready for the final clear application.This will finish eliminating hard edges dfrom the stenciling.
|
70
Final clear applied.
|
71
|
72
After an overnight cure the gloss will be correct and the cabinet can be moved out of the paint shop.
|
73
Playfield is sanded and ready to final polish.
|
74
Playfield polished.
|
75
I will now prep the underside.
|
76
All new braid and sockets are being placed.
|
77
|
78
|
79
|
79a
Will take a while to solder all these in.
|