41
|
42
Cabinet gutted.
|
43
Playfield stripped underside.
|
44
Topside stripped.
|
45
New playfield is sanded and ready to polish.
|
46
Playfield is polished and t nutted.
|
47
|
48
|
49
Will t nut the underside next.
|
50
Underside t nutted.
|
51
Rebuilding the cabinet.Head is built and mounted back on lower.
|
52
|
53
chrome rails powdercoated hinges done in gloss back.Gives a nice look by matching shine even though they are diffrent finish
|
54
|
55
|
56
Cabinet is now on legs.
|
57
|
58
Playfield rebuild in process.
|
59
|
60
|
61
|
62
Insert LEDs are being installed.All super brite non ghosting.
|
63
|
64
|
65
Playfield rebuild is as far as it goes outside of the cabinet.
|
66
Playfield is now installed.Ready to power up for testing.
|
67
|
68
Powered up for testing.
|
69
|
70
|
71
|
72
Just about finished.
|
73
Inside is buttoned up.
|
74
|
75
|
76
|
77
|
78
|
79
|
80
|