1 Game came in already taken apart(in boxes).First I will do the ramps.
2 Made my own harness for both ramps so they will be neater. Right ramp is built.
3
4 Left ramp built.
5
6 New lamp sockets.
7 All wiring run through black shrink tube to further hide and protect it.
8 Donor playfield is being prepped for the first clear.
9 Initial repairs are made at the merlin hole.
10 Shooter lane is reworked as well as possible at this stage.It will be reworked more during the process.
11 First clear applied and wet in the following pictures.
12