41 After curing it will be ready to sand ,detail and final clear.
42 Decals are applied to the head.
43 Lower decals applied.
44 Will finish the edges and begin rebuild next.
45
46 Edges are finished out and the cabinet is ready to rebuild.
48
49
50
51 Supplied rails are installed.These are cut short for some reason but should be fine once the hinges are installed.
52 Black chrome buttons are used to match the rails.
53
54 Supplied glass channel is not for MM.It will need to be cut out to clear the castle towers.
55 You can see the area that is cut out in the cabinet to clear the towers .this will need to be matched up with the channel.
56 Channel has been cut.
57 Channel installed.Correct fit.
58 Legs installed.Matching buttons.
59 Hinges installed.Head on lower.
60 Black mirror blades installed.
61 Plated box built and installed.New leg plates were polished.
62 Cabinet is built and ready to wire.
63 Playfield is polished.
64
65
66
67
68 T nutted and ready to rebuild.
69 Burnt back box connector.
70 Connector rebuilt and replaced.
71 Head wired.
72 Lower rebuilt and wired.
73 Correct labels installed.
74 Shaker installed.Cabinet neatly wired.
75
76 Ready to install the playfield.
77 Playfield rebuild begins.
78
79
80
81