41 Just rough.
42
43 New freshly built cabinet.These are much nicer than the ones I was getting.These are made locally and are far more correct
44
45
46 Lower cabinet is prepped and ready to begin the refinishing process.
47 Primed and guide coated.
48 Head is in primer.
49 Head sanded.
50 Lower sanded.
51 Sealed in black.
52 Lower based and cleared.
53 Head based and cleared.Gloss will die down and level out as it cures.
54 Apron is repaired in the trough area and painted as needed.
55 Apron ready to clear.
56 Apron cleared.
57 I am further perfecting the playfield in the merlin and super jets insert area.
58
59 Ready to clear once more.
60 Cleared.
61
62
63 A definition color was added to the merlin hole to make it look a bit more natural.
64 The super jets insert was reworked a litle more in the ihtrest of making it as accurate as possible.
65 Playfield is done .Will sand and polish it in a few days.
66 Head screened.
67 Lower is fully cured and ready to prep for decals.
68 Lower unmasked and prepped.
69 Braided.
70 Ready to decal.
71
72 Decals applied.Will finish the edges mext and rebuild.
73 Cabinet built.Chrome trim installed as requested.
74
75 Playfield rebuild in process.
76
77
78
79
80