42 Castle swing door is zip tied on.Means it is broken and will need to be replaced.
43 Moat is trashed.Held together with duct tape.
44 Playfield teardown nearly complete.
45 Will start working on rebuilding parts.This game will need much more attention than the norm because every single part is be
46
47 Recondition factory parts will be used to rebuild the drawbridge mech.The only exception is the drive gear which is new.
48 These are the trashed parts.
49 Drawbridge mech now rebuilt.I have made new harnesses for it and added protections.
50 Replacement playfield has been reworked and cleared.All corrections made.
51
52
53
54 While it finishes curing I will continue working on the other parts.
55 DMD panel was cleaned,refinished and rebuilt with a new clear window,color DMD and upgraded speakers.
56
57 New cabinet prepped and in the process of being painted.
58
59
60 Cleared.Will dry down to a lower gloss as it cures.
61
62
63 Cabinet prepped for decals.
64 Playfield sanded and ready to polish.
65 Playfield is polished .
66
67
68
69 Ready to rebuild.
70 Decals are applied.Edges are finished.
71
72
73
74 Cabinet ready for final assembly,
75 Playfield is being rebuilt.
76
77
78
79
80
81