122
All metal was polished in cluding the scews wether they were replaced or not.New coils and or wrappers were also used as n
|
123
Flippers are all properly rebuilt now.All coils were replaced in regards tothe flippers since each one had a sleeve th
|
124
A new plastic set will be installed.The bigger challenge at this point will be cleaning and polishing all the hardware ass
|
125
Example of a now rebuilt plastic assembly.New dome was needed as well.
|
126
Another example of the assemblies.
|
127
Moving n to the ramp now.A new ramp will be installed but there is a lot of work to be done to make the transition.All w
|
128
New clear ramp.
|
129
The flaps will be removed in favor of stainless versions.
|
130
Building the ramp now.This takes several hours as I make my own harness.Reason being that I prefer clean wiring that is co
|
131
Stainless flaps are installed all metal grained and polished as needed.
|
132
Ramp is now built as far as it should be prior to installing it later.
|
133
A new trough is being swapped as well.The old one has most of it's tabs broken off.
|
134
Moving to some of the cabinet parts now starting with the transformer.
|
135
GI plug is very burnt.
|
136
|
137
|
138
New pins and plugs are installed.
|
139
Tranformer is fit to install now.
|
140
The power box and cord are in rough shape.
|
141
Power box now rebuilt with a freshly nickel plated housing,new extended cord,labels ,fuse holder,receptacle and internal
|
142
|
143
Apron cleared.
|
144
New cabinet constructed.
|
145
New cabinet ready for refinishing.
|
146
Cabinet is primed and guide coated.
|
148
New head is refinished.It is wet in the picture but will gloss down a bit as it dries.
|
149
|
150
Lower refinished.
|
151
Head is being screened with the correct text.
|
152
|
153
Cabinet is decaled.
|
154
|
155
|
156
|
157
|
158
Head is being built.
|
159
New rails and hardware installed.Head is now mated with lower.
|
160
|
161
All boards serviced.
|
162
The DMD controller had to be replaced.
|