41 newly added and rebuilt connector.
42 Lamp panel is now removed.
43 Lamp panel torn down.
44 Wiring removed from panel.
45 Recently rebuilt wiring from the lamp panel will be thoroughly cleaned prior to rebuild.
46 Ready to start gutting the cabinet.
47
48 Cabinet is gutted.Lower will be replaced as it is no longer structurally sound and a better cabinet can be made.
49
50
51
52 Coin door is torn down for plating and polishing. A new skin will be installed during rebuild once the other parts are rea
53 New lower now in house and ready to begin prep for refinishing.
54 A new frame was built for the head.
55 Masked and being final prepped for the first primer application.
56 Head is stripped repairs are being made.
57 Lower is now properly gone over any minor ripples or waves have been corrected.
58 Lower ready to prime.
59 Head ready to prime.
60 Lower primed and guide coated.
61
62 Head primed and guide coated.After it cures overnight it will all be sanded and further straightened then primed once more.
63 Cabinet is sanded and being prepped for the second primer application.
64
65 Second primer application is done.
66
67
68 Will be ready to sand and start the painting process next.
69 Sanded prepped and ready to paint.
70 White sealer is sprayed.
71 White base is down.
72 Pink is stenciled.Picked a correct shade to better match the playfield and other pink parts of the game.
73 Head unmasked at the pink stage.
74 Black is stenciled.
75 Stenciling complete.
76
77 Cleared in full gloss the first time around.
78 Sanded to better smooth the lines and edges as well as prep it for corrections and the final lower gloss clear application.
79 Corrections are being made.
80