81 Floor has some sag from the weight of the transformer.I should be able to shore that up.
82 Floor also has some damage at the speaker grill cut out.Should be able to doctor this up on some level as well.
83 Playfield is final sanded and polished.Now ready for rebuild.
84
85
86
87
88 Cabinet is now completely torn down.
89
90 Button guard rails will continue to be needed.
91
92
93 Repairing the floor which includes the break at the speaker grill and eliminating the transformer sag.
94 Sag is gone.After the grill repair dries overnight I will start the sanding and refinishing process.
95 Repair now complete.Underside sanded clean.
96 Inside view of the repair.Inside now sanded clean as well.
97 Floor is solid now.No more sagging.
98 Prepping for repaint as needed.
99 Will catch the button wear in the process although it will be covered by the trim once installed.
100
101 Refinish work in process.A bit of airbrushin on the outside and more of a general refresh style of refinishing on the int
102
103 Unmasked.
104 A much more detailed job was done on the inside as compared to factory.
105
106
107 Pads are applied to finish protecting and disguising the leg wear.Cabinet is ready for rebuild now.
108
109
110
112
113 Rebuilding the playfield at the same time as the cabinet.
114
115
116
117 Playfield wiring nearly finished.
118 Cabinet is being rebuilt.
119
120 Brass trim is being installed as requested.
121 Hinges are in place.