1
Game as it arrived.Not much to highlight really fairly average with a lot of poorly installed mods and typical repairs a
|
2
|
3
|
4
|
5
Since the game will be decaled it makes the most sense to start with a new blank cabinet.On the vinyl underlay cabinets it
|
6
New head.
|
7
Head is primed.
|
8
Lower primed.
|
9
Prepped for paint.
|
10
Based and cleared lower.Wet in the pictures.
|
11
|
12
Head is dried overnight and ready to screen.
|
13
Screened with the correct warning text on the back.
|
14
Lower is dry and at the correct gloss level now.
|
15
Lower prepped for decal application.
|
16
Decals are applied and being finished out.
|
17
New mini playfield will be used.It does not have the flip here lettering and provides a cleaner look.Although it is new
|
18
The correct bevels will be cut in the bare wood areas of the upper and lower portion.
|
19
|
20
Bevels are being cut.
|
21
Prepped and ready to clear.
|
22
Cleared.
|
23
A few days later it has been sanded polished and being built.
|
24
Mini is now done and we can move to other aspects of the restoration.
|
25
Apron is being prepped for clear.
|
26
Apron now cleared.
|
27
|
28
Cabinet edges are finished and it is braided.Ready for rebuild.
|
29
Continuing teardown of the base game.
|
30
|
31
Light corrosion and rust throughout .
|
32
|
33
|
34
|
35
Playfield is out and continues teardown.
|
36
Stripped complete.
|
37
Cabinet gutted as well.
|
38
Will begin reworking all coil assemblies.
|
39
All metal will be polished as it is rebuilt.
|
40
New cabinet is being assembled with the removed and serviced parts.
|