1 Starting platform.Typical fade,bumps and bruises.
2
3
4 Teardown underway.This one seems a bit dirtier than the norm.
5
6 Plenty of dirt inside as well.There are some wiring hacks and light oxidation.
7
8
9 Underside is nearly stripped.
10
11
12 Topside teardown almost complete.
13
14 Playfield is stripped and out of the game.
15 Cabinet teardown is next.
16 Boards are dirty and will need some repairs in the GI section which is very typical on most early WPC-95 drivers.
17
18 Cabinet teardown is in process.Boards removed.
19 Interior teardown.
20 Cabinet is stripped down ready for repairs.
21
22
23 The back is stripped of all it's labels and decals.
24
25 The head during the repair process.
26
27
28 Ready forthe first application of primer.
29 Lower cabinet is primed.
30
31 Head is primed.
32 Lower cabiner is sanded and trimmed out.
33
34
35
36
37 Cabinet is re groundbraided.
38
39 Back of the head is freshend up.
40 New decals are applied.