1
Base game as it arrived.Will get more into the actual condition later but for now setting up the album.
|
2
|
3
|
4
First thing is to get the supplied repro playfield in proper order so it can cure as other aspects take place.
|
5
Shooter lane is nice it will need to be a little wider though.This is a first run repro so it needs a little less rework th
|
6
There are some gaps in the insert art.Likely the screening and finish just did not take in this area.This will be filled an
|
7
Fish eyes and rough texture throughout the rest of the finish.
|
8
Mosh pit hole will need to be properly beveled to accurately match the factory.
|
9
Sanded with corrections made .
|
10
Repaints and repairs were made and it is now cleared.
|
11
Shooter lane is wider .
|
12
|
13
Cracks in the inserts are gone.
|
14
|
15
|
16
Proper bevel at the mosh pit hole.
|
17
Will let this cure and move to the cabinet.
|
18
New cabinet is built and prepped for refinishing.Monster bash in particular benefits most from a newly constructed cabi
|
19
New lower primed and guide coated.
|
20
New lower based and cleared.Still wet.
|
21
New head is done as well.
|
22
New lower now fully cured.
|
23
At the correct gloss level now.
|
24
Heaqd now dry.Will be screened with the correct warning text prior to prep for decal application.
|
25
Replacement playfield is fully dried over the course of weeks and now sanded and ready for polishing.
|
26
Playfield polished.
|
27
|
28
|
29
|
30
Playfield can now be t nutted and is ready for build up.
|
31
Tearing down the base game now.
|
32
Batteries are leaking.
|
33
AV board also needs work.
|
34
|
35
Lamp panel is rough.Taped,wrong channels,glass is too thin also.
|
36
|
36a
|
37
Working on the parts as they are removed.Starting with the lamp panel.
|
38
|
39
Lamp panel is torn down and cleaned.
|