114
|
115
All metal playfield parts are polished and ready for installed
|
116
Playfield is being built.
|
117
Working on the wiring now.
|
118
Daisy chains of generic 22 gauge wire are being removed and replaced with color coordinated 18 gauge wire for easi
|
119
|
120
Generic daisy chains are removed from the switch harness as well.
|
121
|
122
Working on building the head now.
|
123
Brackets will be stripped and polished.
|
124
Example of the brackets now refreshed.
|
125
Edges are finished through airbrushing not markers or paint pens .
|
126
Head edges are refinished.
|
127
Serviced boards are ready for install.
|
128
Head is now on lower.
|
129
All new trim and associated hardware are installed.The reworked lamp panel is also in place.
|
130
New door was required so that is installed.
|
131
|
132
|
133
Newly built topper at the bottom original up top.While the foiling is not present the new still looks much better
|
134
Will install this on the head next.
|
135
Speaker panel plastic is cleaned and polished as well as possible.
|
136
DMD assembly is built using a new wood panel.
|
137
DMD panel in place.
|
138
Topper is installed.
|
139
Cabinet is neatly wired.
|
140
|
141
Power box was nickel plated and rebuilt with a service outlet and correct internal components
|
142
|
143
|
144
|
145
|
146
|
147
|
148
|
149
|
150
|
151
Game is done will get it outside for finished pictures weather permitting.
|
152
|
153
|