81
Now the cabinet has cured a couple days and it is being final sanded and prepped for painting.
|
82
Corners were sharpened as well as possible.
|
83
Minor divots are being filled .these are from nail holes during the assembly and smaller voids in the wood that could not
|
84
Same type of minor touches are being done to the head prior to a final fine sand and then it will be masked and painte
|
85
Painted and matte cleared.
|
86
All black parts were redone.
|
87
Glossy and wet right now will dry a bit flatter and correct.
|
88
Black parts now dried overnight.
|
89
|
90
Cabinet is dry now as well.
|
91
|
92
|
93
|
94
Ready to screen the back.
|
95
Back is screened.
|
96
Braided and partially built.
|
97
|
98
Ready to decal.
|
99
Decals are applied.
|
100
|
101
Edges finished and now the cabinet is being rebuilt.
|
102
|
103
Ready to wire then the playfield will be assembled.
|
104
Serviced driver.
|
105
Serviced AV board.The ROMs will be swapped.
|
106
Up on legs now with the supplied new door installed as well as the boards.It is being wired at this point.
|
107
Replacement playfield has been corrected and clear.It is fully cured and ready to prep for rebuild.
|
108
|
109
Shooter lane was reworked so it is more accurate.
|
110
|
111
|
112
Topside is being built.
|
113
|
114
Neon post are used in the lower areas because they perfectly match the accent colors in this area of the playfield.They ar
|
115
Black rubber is used to complete the match and tame the play down a little as AFM can be very fast and unruly when
|
116
|
117
|
118
|
119
Top is good for now so it is time to focus on the underside.
|
120
Underside rebuild is in process.
|