41
Mold is another problem we are dealing with on this game.It was obviously kept in a damp location and has a musky smell tha
|
42
Playfield is torndown.
|
43
Now stripped bare the Mylar needs to be removed.
|
44
|
45
|
46
|
47
Rough plug at the added drop target bank area.
|
48
Various holes will need filling.
|
49
Inserts are in unusual spots for this tiltle.
|
50
Pulling the Mylar.Scary on a game so rare of course but the worst is still ahead of me when it comes to the glue removal.
|
51
Mylar is pulled without issue so far.
|
52
|
53
|
54
|
55
Now the glue is removed.It was tedious and time consuming but all went well.
|
56
|
57
|
58
|
59
|
60
Going to start working through the mechs now.
|
61
|
62
John has rebuilt the pop bumper assemblies .
|
63
New labels were made,new bodies used etc.All parts polished.
|
64
|
65
Other mechs are being cleaned and serviced.
|
66
Drop target bank is done and the previously rusted VUK is in good shape now.
|
67
Working on the structural parts of the cabinet first.
|
68
|
69
|
70
I may try to salvage these chocks since they are different than most and in workable shape.
I will need to make a hol
|
71
As previously covered the head is rough especially the back panel.
|
72
Since a new panel is not practical I will rework this one.
|
73
Sanded,drilled and dowels are now place to give structure, strength and help bond it all together.
|
74
Now I am roughing it all in with filler.
|
75
The inside is being worked as well as the face and other damaged areas.
|
76
Will glue and clamp the cracked lower panel on each side.
|
77
|
78
|
79
The glue will set overnight.
|
80
Continuing to work the interior section of the rear panel.
|