120 The entire playfield is masked and the wood tones are refreshed through out.
121
122 The SOL kickout damage is being worked now starting with the orange.
123 Light gray areas damaged from the SOL area and ramp flaps are addressed.
124 Dark gray areas of concern are done.
125 the rest was detail work done by hand.Things like the black borders and minor details in the SOL area are taken care o
126 Second clear applied.
127
128
129
130
131
132 SOL area and insert rework has turned out better than anticipated at the beginning stages.
133
134 This should close the playfield restore out less the final sand and polish depending on how the clear settles in over th
135 Playfield is now final sanded and ready to polish.
136 Polished.
137
138 Shooter lane is nice .
139
140 Inlane repairs final.
141
142
143 SOL hole and insert repairs have greatly improved the playfield.
144 Ready to rebuild.
145 Cabinet is ready to decal.
146 Head decals applied.
147 Lower decals applied.Will finish the edges next and then begin reassembly.
148 Edges are finished and the game is being assembled.Chrome trim is being installed as requested.
149
150 All boards have been serviced.
151
152
153 The driver was replaced with a better version that does not have as much burn in the GI section.The previous one was jus
154 Polished chrome legs.
155
156
157 Will rework the coin door now .Once reworked the cabinet will be wired.
158 Coin door now refinished in the factory style.
159 Door is rebuilt with new slots and installed.