160
Cabinet now neatly wired a new speaker was required.
|
161
All tags and labels are installed.
|
162
|
163
|
164
Playfield is ready to build.
|
165
Topside is being built.
|
166
all metal parts were polished,plated or regrained depending on condition and what is appropriate.
|
167
An outer style(Cliffy)protector is used at the SOL hole to protect all repairs and eliminate the potential for future wear
|
168
Backboard is decaled to give it at least a little character.
|
169
|
170
|
171
|
172
Ready to wire and build the underside.
|
173
All coils assemblies have been cleaned,polished and rebuilt.
|
174
New targets are required in the bank area.
|
175
A protector is put in place at the drop target hole.
|
176
LEDs are installed as requested.
|
177
Resting brackets plated.
|
178
Branded with the HEP logo.
|
179
Underside wire and rebuild complete.
|
180
|
181
|
182
Ready to go back in the cabinet.
|
183
New plastics are being installed as needed.
|
184
The existing ramps will be reworked.
|
185
Starting with the rear ramp.
|
186
Rear ramp cleaned,polished and rebuilt with a new stainless steel flap.
|
187
Playfield is installed and ready to power up for testing.
|
188
Powered up for testing.Everything looks good so it should close out in another couple hours.
|
189
Smaller ships are refinished to match the new larger ship.
|
190
Ships and other ramps now rebuilt and installed.
|
191
|
192
|
193
All lights tested.
|
194
|
195
|
196
|
197
|
198
Game is complete less a little detailing.
|
199
Translite panel has been cleaned,new sockets installed as needed,now full LEDs installed and tested prior to rebuilding
|