81
New playfield rails were made of oak .
|
82
Rails are installed along with the numerous plated parts and regrained ball guides.
|
83
|
84
Carrying the black theme throughout the build.
|
85
|
86
The previously missing brackets and plastics are being placed as they should be.
|
87
About ready to flip and begin the rewiring process.
|
88
|
89
Cabinet build almost complete.Will put the trim on last after the playfield is in place.
|
90
|
91
Will start rebuilding the underside at this point.This will be the most time consuming aspect left even after putting so mu
|
92
New magnets are in place.All targets will be replaced with the new ones pictured.
|
93
|
94
Switch harness is in place.
|
95
All new wiring was run for the targets and daisy chains.
|
96
|
97
Had a decent spare plastic trough that is tinted that I was able to donate to the project.
|
98
Next up is the lamp harness.All sockets must be replaced due to corrosion.During that time I am also replacing all the fragi
|
99
All new GI sockets are being placed throughout.
|
100
Example of the color correct style of wiring with the added benefit of being a thicker gauge which will mean it is more
|
101
Example of the feature lamp sockets replaced.The supplied LEDs are installed as well.
|
102
Now working on the solenoid harness.
|
103
|
104
Solenoid harness is roughed in place and will require a fair amount of rework.Once that is done I can tighten it all up an
|
105
Nicer and polished loom brackets.
|
106
Donor coin door gutted to build a correct style door out of an NOS skin.
|
107
|
108
Correct style and country door built and installed.
|
109
Blacked out topper and supplied LEDs installed.
|
110
Playfield placed in the cabinet.Most mods are now properly installed.
|
111
|
112
|
113
|
114
|
115
Just about ready to put the trim on and close this out.
|
116
Trim installed.
|
117
|
118
|
119
|
120
|