1 Replacement playfield.It has set for quite a while and this is done on purpose because I have found that some issues can
2 Minor bubbles have developed in the inserts.This seems to be very common on these.I would say 75 percent of them I have
3
4
5 Sanded and now minor reworks are done on the lower inserts.
7 Cleaned and ready to clear.
8 Cleared.
9
10
11
12 Now months later sanded buffed and prepped for rebuild.New oak playfield rails were made
13
14
15
16
17 T nutted.
18 New head.Being prepped.
19 New lower prepped.
20 Head primed.
21 Lower primed and sanded.
22 Painted and cleared.
23 Decaled.
24 Head screened and decaled.
25 Ready to build.Will gather the donor parts and condition them.
26
27
28
29
30
31 Head is built.
32 New coin door was needed.
33 Plated power box .
34 Up on legs.
35 Black trim installed.
36 Head on lower.
37 Ships painted a very similar color to the original with just a light flash of fine metal flake to better emulate a real s
38 LEDs installed in small ships.
39
40 Mother ship built and refinished to match.
41 Donor speaker panel is refinished.