81
Head is being built.
|
82
Bottom is detailed and cabinet is being braided.
|
83
Edges are finished.
|
84
Power box needs help.
|
85
Power box polished and plated then rebuilt.
|
86
Lower is being built.Chrome trim installed as requested.
|
87
|
88
|
89
|
90
|
91
|
92
Wiring is complete.Speakers upgraded as requested.
|
93
|
94
|
95
Reworking some of the last few playfield parts like the apron.
|
96
Worn to the metal in the ball return section.
|
97
Repaired and painted.Will clear it next.
|
98
Cleared the apron.
|
99
Backboard decal will be replaced.I prefer the decal to the lighted backboard because the decaled version is "always o
|
100
New decal in place.
|
101
Playfield is t nutted.
|
102
Playfield is ready to build.
|
103
Topside rebuild in process.
|
104
|
105
|
106
|
107
|
108
|
109
Ready to start on the underside.
|
110
All coils have been rebuilt and polished.This was a bit tougher than normal because of how badly corroded it was as well a
|
111
Flipper polished and rebuilt.
|
112
Working with the switch harness.The targets are beat.The biggest issue is corrosion on the rivets and the condition of the
|
113
the sling switches are beat as well.They could be salvaged but the wiring is fragile as well so by the time all that is
|
114
Sling switches are built.Brackets were polished and the new targets are prepped.
|
115
Better wiring is used to build the sling switches back into the harness.It is thicker and longer for better routing.Ther
|
116
The coils are being rebuilt .
|
117
Troll assemblies are beat .
|
118
All other coil assemblies polished and rebuilt.Most if not all will have all new wiring and plugs once installed.
|
119
The merlin scoop is trashed and will be replaced with an upgraded version.
|
120
|