121
Now on to the most time consuming harness which is the lamp harness.Teh reason it is a chore is that I will be replacin
|
122
All the solder points are rough or breaking.This is just one example.I could easily doctor it up but it would be good
|
123
New sockets are being placed.
|
124
New sockets are wired in with heavier gauge wire that is more color correct and will be easier to identify in the future
|
125
This is just some of the trash that has come out of the harnesses as they are rebuilt.
|
126
The lamp harness is now complete.Various examples are shown where the GI is reworked.
|
127
|
128
|
129
|
130
the coils are in place now and I will start working the coil harness next.All coils have new wiring and much better sold
|
131
Wiring is mostly complete now and the playfield is just about ready to go back in the cabinet.
|
132
|
133
|
134
|
135
Just about to put the playfield in the cabinet and finish things up.The slide brackets need some work.There is paint on
|
136
Slide brackets are cleaned and polished as well as possible.
|
137
|
138
Now for the trolls.They are obviously newer and have lit eyes but they are a wreck otherwise. The carriages are beat ,the
|
139
|
140
The flaps have cheap repro decals and under them they have been painted red.I will strip and metal etch them prior to inst
|
141
New switches and wiring will be used as well as new carriages.
|
142
Flap is stripped and metal etched.
|
143
Correct decal are installed.
|
144
The correct springs will be used.The correct is on the left what was previously installed in on the right.
|
145
Troll assemblies are done.They have new extended wiring that is full protected and now both the lamp and switch is on a t
|
146
A mating plug in the harness is being made for the troll assemblies.
|
147
Mating plug is complete.
|
148
Playfield is in the cabinet now.
|
149
Just about ready to power up for testing.
|
150
Rebuilding the drawbridge now.This one is not the worst I have seen but it has been rigged a bit with a spring to compensa
|
151
The wires and switches are beat/fragile.
|
152
New gear and pivot.
|
153
New switches and wiring are in place with protections in place so they will not easily break.
|
154
|
155
New wiring for the coil and motor as well both extended and protected with heavier gauge used for the motor to make it more
|
156
Solder points are solid on the motor leads.This is a common break point.
|
157
Trash out of the drawbride assembly.
|
158
New moat popper is needed.Will go with the stainless version.
|
159
The old one is very rough.
|
160
New popper,wiring and protections put in place.
|