41
42
43 Head is repaired.Pins were installed and filled at the lower joints to make them solid and durable moving forward.
44 Head is primed.
45
46
47 Lower primed it will sit overnight then be sanded and painted then cleared in semi / lower gloss as requested .
48 Cabinet is sanded based in black and matte cleared.Will dry flatter than pictured.It is wet in this picture.
49 Head is refinished also.
50 New chocks refinished.
51 Bolts refinished.
52 Hed is dry,prepped for decals and screened with the correct warning text.
53 Lower prepped for decals.
54 Playfield has been corrected and cleared.Corrections were enlarging and lengthening the shooter lane to the correct factory
55 Shooter lane is now correct.
56 Polished.
57
58
59 T nutted.
60 New rails were made and installed.
61 Topside build is in process.
62
63 All ball guides regrained.
64 All metal polished.New post installed.
65
66
67 Ready to wire the underside.
68 Underside wiring is in process.
69 Most generic daisy chains were eliminated in favor of more color correct/durable wiring.
70
71 All coils and mechs have been polished and rebuilt.
72 New wrappers or coils if needed.
73 Decals are applied.
74 I will finish the edges out next and assemble the cabinet then mate it with the playfield that is finishing up.
75 Edges are finished out.The cabinet is ground braided and being reassembled.
76
77 Transformer is reconditioned.
78 All metal is polished.
79 New plastic protectors are installed at the leg locations.These are undersized not oversized.
80