162 Cabinet is rebuilding.
163 Playfield is sanded and ready to polish.
164 Playfield is polished.Lots of pictures to follow to document the end results since it took quite a bit of extra effort.
165
166
167
168
169
170
171
172
173
174
175
176 Outside pictures of the playfield just before the t nut installation and rebuild.
177
178
179
180
181
182
183
184
185
186
187
188
189 Building the head.
190 Boards service Driver as example.
191 Head on lower.
192 Power box polished and rebuilt.
193
194 New coin door installed.Cabinet is wired.
195
196
197 Starting playfield rebuild.
198 Back panel will be stripped refinished and redecaled.
199 Stripped.
200 Panel is decaled and rebuilt.
201