81
Matte clear is applied and while it shows glossy right now I will be less glossy once it cures.
|
82
Final clear is applied to the head.
|
83
|
84
Final clear is applied to the lower.
|
85
|
86
|
87
Once this dries it will be the desired gloss level and the cabinet can go into rebuild.
|
88
Ready for rebuild.
|
89
|
90
Transformer panel will be rebuilt then placed.
|
91
Transformer/rectifier board is serviced.
|
92
The metal panel is nickel plated to eliminate rust and corrosion,the transformer is cleaned and refreshed.
|
93
Coin door is a wreck.I will tear it all down.Have the internal parts replated then rebuild it with a new skin and make
|
94
Coin door torn down.Lots of parts to these.
|
95
A new set of legs are painted black and cleared to match the cabinet.
|
96
The previously missing backglass latching system is sourced and installed.
|
97
Head is being built up.
|
98
Cabinet protectors are installed to keep the legs from damaging the cabinet paint .
|
99
New rails are installed.
|
100
All boards have been serviced and are ready to be installed.
|
101
Boards are in place along with new made paper work for the head.
|
102
Coin door is rebuilt with a new skin and the plated parts.
|
103
Custom made buttons are installed to better match the cabinet colors and theme.
|
104
The rebuilt parts and wiring are neatly routed and installed in the cabinet.
|
105
Lamp panel is torn down and will be refinished then rebuilt.
|
106
Lamp panel is refinished and the wiring harness is soldered back in place.
|
107
Skipped most of the playfield process since it was a very tedious job that was taking place in the background.The playf
|
108
Playfield is installed in the cabinet.The playfield is NOS the plastic set is new and some mior changes were made in
|
109
|
110
|
111
|
112
Remote battery pack is in place to avoid future CPU damage in the event of battery leakage.
|
113
Lamp panel is rebuilt.Displays were cleaned and serviced.
|
114
Powered up for testing.
|
115
Displays are tested.
|
116
Glass is thoroughly cleaned and rebuilt with new trim including the correct chrome lift channel.
|
117
Apron is in place and the lockbar is regrained then fit..
|
118
Game is complete and final pictures will be taken.
|
|
|