41
Final clear applied and wet in the picture.I will let this cure as the rest of the process takes place.
|
42
New lower cab is being prepped for refinishing.The head is already done in the background.
|
43
|
44
|
45
New lower is prepped for primer.Any minor imperfections were addressed prior to because even new can use a little work.
|
46
Lower is primed.
|
47
|
48
Lower refinished and cleared.Wet in the picture but will gloss down as it dries.
|
49
All other black trim refinished as well.
|
50
Now that the cabinet and playfield are in place I will gut the donor game.
|
51
|
52
|
53
|
54
|
55
All wiring is removed and separated.
|
56
All coil assemblies will needto be polished and rebuilt.
|
57
Playfield is stripped. complete.
|
58
Cabinet is gutted completely.
|
59
|
60
I will restore all parts one at a time.First the board panel from the head.
|
61
Cleaned and ready for use.
|
62
Transformer flashing.
|
63
Cleaned and lightly polished.
|
64
The transformer.
|
65
Cleaned and lightly refinished.
|
66
Strobe board is missing a component .
|
67
Missing component is added.
|
70
Target bank motor is in need of cleaning and servicing.
|
71
Other side is filthy.
|
72
Cleaned polished and checked over.I will address any wiring needs or improvements during reassembly of the playfield it
|
73
Motor is polished and the gears are freshly greased.
|
74
Mothership assembly will be gone over now. There is a new cover in place but it is broken and does not fit right.The reaso
|
75
A new LED board was already installed so that is fine.
|
76
This is the culprit for the broken saucer cover and probably other issues like less active shaking of the ship etc.
|
77
The assembly is broken down and a new saucer cover ,plate are in hand along with a supplied upgraded strobe assembly.
|
78
The new cover and old base were refinished in silver/titanium and the unit is reassembled using the correct plastic scre
|
79
New strobe is also in place.
|
80
The smaller ships are separated from the domes and prepped for refinishing.
|
81
Smaller ships are refinished.
|
82
A saucer LED kit will be installed in the smaller ships.
|