121
Cabinet wiring is complete.
|
122
|
123
|
124
Remote for speakers now located on the inner door.
|
125
|
126
Playfield underside rebuild is well into progress.
|
127
Swapping and rebuilding a few stray mechs at this time so I can better judge the wiring needs.
|
128
|
129
Trolls are going to be rebuilt now with new swiches,heads with lit eyes.
|
130
Trolls rebuilt.A dedicated pluge was made for each one so removal will be easy when needed and no alligator clips ar
|
131
Mating plug in the harness for trolls.
|
132
Toll mechs rebuilt and rewired.
|
133
Finishing up the drawbridge rebuild with upgraded switch wiring that has proper protections in place to make it les
|
134
New moat is being assembled using all new sockets,switch etc.
|
135
New harness is made for the moat this will be a better fit.
|
136
All new premium non ghosting LEDS are being installed.
|
137
The upgraded castles and towers will be put in place now so I can address any wiring concerns from underneath at t
|
138
New castle face and old. 6 wires from the new face to be implemented into the harness.
|
139
New towers and base.10 wires from these to implement into the harness.The base for each tower must be salvaged from the
|
140
The scrap fro the old tower mech.
|
141
New tower mech is built.
|
142
Proper mating plugs are installed throughout the harness to give easy and removable connections as well as maintain fact
|
143
Underside rebuild is as far as it goes outside of the cabinet.
|
144
|
145
Playfield is in the cabinet and mostly built just a ramp and wireform plus some minor details away from completion.
|
146
Going with a more appropriate cap color on this build to further separate it from others I have done.Once everythi
|
147
Powered up for testing.
|
148
|
149
Has a very nice glow about it.
|
150
Playfield rebuild is complete.
|
151
|
152
Two headed dragon in place.
|
153
|
154
|
155
|
156
|
157
|
158
|
159
|
160
|