204
205
206
207 Metal parts are ready for use.
208 Rebuild of the topside is in a position where it can be flipped over for the underside rebuild.
209
210
211
212
213 The ramp divertor bracket is much improved to say the least.
214
215 Underside rebuild is beginning .
216 Rebuilt mechs and boards are placed.
217
218
219
220 Wiring of the underside is next.
221 Targets are being replaced as needed.
222
223 Other metal is polished and the corrosion is removed.
224 Many of the bulbs are frozen in the sockets from corrosion.
225 Some sockets must be replaced.
226
227 Underside wiring complete.
228
229
230
231
232 Building up the topside a little more before installing it into the cabinet as an assembly.
233
234
235
236
237
238
239
240
241 Original ramp is being reworked.
242 Broken at the left entrance.
243 Switch bracket is in a position that will not allow the use of the preferred(based on gameplay) ball trap bracket so