244 More rust and corrosion to deal with.
245 The ball trap bracket for the ramp is sourced.
246 Slight adjustment made and the par is installed.
247 Ramp is installed.
248 The ramp divertor bracket has been cleaned and polished.It was very rusted previously.
249 A repurposed part is used to fix the ramp entrance issue.This was an easy less intrusive way to do it so it can
250
251 Everything is plugged in now.The tags present were all saved and used.
252
253 Playfield is in the cabinet.
254
255
256
257
258 Powered up for testing.
259 Game is finished.
260
261
262
263
264
265
266
267
268