81
|
82
|
83
Ready for the first clear.
|
84
First clear is applied.
|
85
|
86
|
87
|
88
After a few days of cure time I will sand it back down and start the more detailed repainting process.
|
89
Gutting the cabinet now.
|
90
Various spills and rust throughout.
|
91
|
92
|
93
|
94
Most of the chocking and set blocks are poorly installed and will be redone.
|
95
|
96
|
97
|
98
|
99
|
100
This bracing willneed to come out and to be reset.
|
101
The main issue is the spilled drink in this hard to reach corner.
|
102
Head gutted and removed.
|
103
There is some warping and water damage on the top frame.
|
104
Large gap where the warping has occurred.
|
105
Cabinet is gutted .
|
106
|
107
Cabinet is ready to strip of the art.
|
108
Art is stripped.
|
109
There are some seames and gaps that will need to be reworked.
|
110
|
111
Head is stripped of art .
|
112
I will fill this area now that I have properly leveled it.
|
113
|
114
Head repairs are in process.
|
115
The chocking and bracing is being removed from the floor.
|
116
|
117
|
118
The old speaker plate is trash and will be replaced.
|
119
Floor was sanded as clean as possible it was then lightly refinished with a wood tone color and sanded once more.The ch
|
120
Repairs are in process on the outside of the lower.
|