81
Head prepped and primed.
|
82
New head painted and cleared.Still wet.
|
83
Lower painted and cleared.Also still wet.
|
84
Playfield is being prepped for the next session of repairs and repaints.
|
85
|
86
Ball drop damage repaired.
|
87
Entrance ramp damage repaired.
|
88
Basement hole repaired.
|
89
Other wood tone concerns to address will be the ground in dirt and chipping at the switch cut outs.
|
90
Wireform entrance chip repaired.
|
91
|
92
Wood tones are painted heavily as needed and lightly where not for a uniform look that eliminates the damage and the bul
|
93
Other concerns are addressed.
|
94
Second clear applied.
|
95
|
96
Shooter lane is much improved.
|
97
Book area looks good.Still not perfect but with the lettering etc that is impossible to achieve so a little line here o
|
98
|
99
|
100
|
101
After this sets a couple days I will sand it down for the final repaints and clear application.
|
102
Cabinet decals are applied.
|
103
Edges are finished in correct colors not just blacked out.
|
104
Cabinet protectors are installed.
|
105
|
106
Cabinet is building up.
The trim will need to be replaced though so it is not installed yet with the exception of t
|
107
|
108
Most of the brass is back from plating.The apron will be used as an example.
|
109
The previously installed trim was saved with the intention to reuse it but it is far too orange in shade to match all
|
110
The backboard is rebuilt with a new decal.
|
111
New lower profile lamp sockets and more robust wiring is installed on the backside of the backboard panel to replaced t
|
112
|
113
Final rework is done to the playfield.
|
114
Sanded and ready to polish.
|
115
Polished and ready to build.
|
116
|
117
|
118
|
119
|
120
|