119
The two different shade of yellow are repaired as/where needed.
|
120
The center section of green is done along with the orange.The green is very tedious,.
|
121
The Dracula lettering is done along with the blue and the counts face.That is a very tough repair but the dark circl
|
122
Repairs are complete at this point and we can move towards the next clear application,
|
123
|
124
|
125
|
126
Second clear is applied.
|
127
Starting to fall into place now.
|
128
These are the most troubled inserts and while not perfect they are looking much better.
|
129
|
130
|
131
This area is much improved.Hard to appreciate the level of effort it takes to pull the face repaint off but it is hard
|
132
|
133
Will let this cure a few days then it should be ready for the final tweaks and clear.
|
134
Old plastics are trashed and replaced.
|
135
New plastic set is built/swapped.
|
136
Head screened.
|
137
Prepped for decal application.
|
138
Lower sides are placed.
|
139
|
140
|
141
Head is decaled.Will finish the edges next.
|
142
Front applied.
|
143
Edges are finished and a good effort is made to match the edges as well as possible to the color of the cabinet art.
|
144
This side is a little tougher because there are multipile colors and shading coming together and it differs from the s
|
145
Cabinet is braided and assembly is beginning.
|
146
|
147
Black trim and accents are being placed.
|
148
Head is being prepped for install.
|
149
Head is on the lower now.
|
150
|
151
These were the most hacked,or troubled boards of the lot and have all been professionally repaired.
|
152
The serviced boards are placed.The others will follow.
|
153
Black ultr thin mirror blades are installed.The protective film is left in place for now only peeled back where need
|
154
Playfield is sanded and ready to polish.There are one or two areas that don't look 100 percent at this stage but will
|
155
Playfield is polished.
|
156
|
157
|
158
|