1
Starting platform as received.
|
2
|
3
|
4
Playfield prior to teardown.
|
5
|
6
|
7
Interior starting platform.
|
8
Underside prior to teardown.
|
9
|
10
|
11
Underside teardown in progress.
|
12
All the wiring harness have been removed and separated one at a time.
|
13
Underside is basically stripped.
|
14
Topside teardown in progress.
|
15
|
16
|
17
Playfield completely stripped and out of the cabinet.Ready for clean up and repair.
|
18
Underside completely stripped including t nuts.
|
18a
Playfield is cleaned up ready to begin touch ups and prep for clearcoating.
|
19
Rack of parts thus far.
|
20
Cabinet teardown is next.
|
21
Head is stripped down.Still have some brackets etc to remove once it is taken off the lower cabinet.
|
22
Lower cabinet is being torndown.
|
23
Lower cabinet is completely gutted.
|
24
Intial clear is applied.
|
25
|
26
Cabinet is ready for repairs.
|
26a
|
27
|
28
Stripping is underway.
|
29
Head is done in vinyl so that is being stripped as we,,.
|
30
|
31
Intital repairs are made head is in primer.
|
32
This is a picture of both #3(outer)and #4(inner).
|
33
Cabinets are primed.Ready to refinish.
|
34
Final clear on #4 playfield.
|
35
|
36
|
37
Cabints are ready to finish out.This will mean sanding the underside etc.
|
38
Cabinets are ready to decal at this point.They have been trimmed out and have all new ground braid.
|