Playfield should be all set now.I will sand and polish it in a bit.
|
124
Now that everything is in order I can start soring up the final parts.First the ramp set.The originals are trashed
|
125
The original ramps have a lot of issues to address besides just the broken ramp itself.Other problems are that all t
|
126
For this one ramp I have a true NOS ramp in it's original packing.
|
127
The flaps of the replacement ramps will be replaced with stainless steel versions.
|
128
New ramp is built up with the stainless steel flap,all new plastics and hardware.
|
129
|
130
Playfield is sanded and ready to polish.
|
131
Playfield is polished and now t nutted.The rails are new made out of oak by TaylorVA.
|
132
|
133
|
134
|
135
|
136
|
137
Underside was sanded as clean as possible.There were many splintering parts and things that had to be filled so it
|
138
|
139
|
140
|
141
|
142
|
143
|
144
|
145
|
146
|
147
|
148
Cabinet is built up just about ready for wiring.
|
149
|
150
|
151
Edges were painstakingly refinished to match the art as well as possible.
|
152
Boards were serviced.
|
153
Lamp panel will be refinished and rebuilt.
|
154
Speaker panel was cleaned polished and rebuilt with new color DMD and factory speakers.
|
155
|
156
Refinished and rebuilt lamp panel and dmd panel are in place.All LEDs were used as requested.
|
157
Cabinet wiring is complete.
|
158
Playfield is in place.
|
159
Powered up for testing.Has the lighted speaker grills as requested.
|
160
|
161
|