1
Sample IJ base game.It looks okay from across the room but really it is a wreck overall.The most important things are in
|
2
|
3
|
4
|
5
The head isn't faded because it has been redecaled.
|
6
Unfortunately that effort sucked.The borders are not even it is in a slant.
|
7
Painted black over the warning text.
|
8
The cabinet is trash but we just build new ones anyway so who cares.
|
9
Lockbar is trash no big deal we would replace it with gold anyway.
|
10
The good parts.
The playfield.Very nice lots of potential.
|
11
|
12
Game is missing a ball guide for the catch.I have one so that is good news.
|
13
What is really important on a true sample game besides some of the other things I will note are that it has much more gol
|
14
|
15
|
16
another important sample feature is the metal rails.Can't do an all out gold IJ without them.
|
17
|
18
That closes out the playfield evaluation.
|
19
The floor of the cabinet is swollen and water damaged.
|
20
The inside is on par with the outside of the cabinet and only worth documenting for completeness .It is sloppy,dirty
|
21
|
22
|
23
|
24
|
25
Underside is what you would expect of a starting platform like this.It looks pretty bad but nothing that can't be ov
|
26
Metal is corroded here and there which is typical and easily resolved through plating or manually polishing depending
|
27
Taking a look inside the head now.
|
28
Translite looks like it will clean up without issue.
|
29
The lamp panel is trashed due to the moisture exposure.It will require the making of a new one.
|
30
Metal is rusted on the lamp panel brackets.
|
31
DMD panel is just as bad.A new one will be made.
Essentially all wood besides the playfield will be new construction
|
32
I will strip this so I can copy it.
|
32
Wiring removed.
|
33
Ready to copy.
|
34
Gutting the core.
|
35
Stripping the playfield.
|
36
All wiring and parts are removed from the playfield.
|
37
Removed parts are being separated and categorized.
|
38
Wiring is being dived and removed parts to be plated etc are being boxed.
|
39
Playfield is stripped complete and ready to go into the paint shop.
|