Apron stripped based and cleared.
|
44
Playfield is sanded and ready to polish.
|
45
|
46
|
47
|
48
Polishing is complete.
|
49
Cabinet is being prepped for the final clear application.This will be the matted clear. won't be too shiny won't b
|
50
Lower prepped.
|
51
Final clear applied.Wet right now so it will look glossy but will die down as it cures.
|
52
|
53
Final clear on head.
|
54
|
55
Cabinet is dry and now it is in the rebuild area.
|
56
Braiding the lower.
|
57
|
58
Plated parts are being tapped and installed.Parts were nickel plated for durability and to overcome age issues but not
|
59
Head is being built.
|
60
New paperwork inside.
|
61
All new boards less the sound board which is not reproduced at this time.
|
62
|
63
New rails installed.
|
64
Plated hardware being installed.
|
65
Head is attached to the lower.
|
66
|
67
Up on legs.
|
68
Apron is cured now and ready to apply the art to.
|
69
Apron art applied.
|
70
Coin door is built.New skin.
|
71
All new wiring harness was made.Internal parts were nickel plated as needed.
|
72
Transformer panel is built and being placed.All new boards throughout the game.
|
73
Other various internal pats were refinished,plated and polished as needed.
|
74
Playfield is being built.
|
75
|
76
|
77
|
78
|
79
Underside is being wired and rebuilt.This is a big task because all the sockets must be replaced /swapped to the more
|