121
Some cut through at the lagoon hole.Not much but now I know the surface is level.This area will be reworked for a final tim
|
122
Lagoon area resprayed.
|
123
The purple at the mosh bit has been tweaked a little more and blended back just a little to give it a smooth transition.
|
124
Purple is much better now.This proto had a slightly different shade than the norm which threw me a bit.
I will still
|
125
Lagoon area almost complete.I think I am going to leave the wood alone around the hole.It has just a little ground in dirt
|
126
One single coat of clear was appled because I know I want to sharpen up the black borders now that I have everything mat
|
127
Lagoon area is good.Might tighten up the hole just a little but I will see how it all levels out first.
|
128
Mosh pit is great.Needs a tweak on the black bordering but all else is just what I am looking for.
|
129
I did freshen up the wood tone on the drac track it was just a little too rough to leave alone.
|
130
After it sets up a couple days I will sand it down and finish it up.
|
131
Sanded down for the final tweaks and clear.
|
132
Mosh pit border is masked and sprayed.
|
133
Final result.
It has been tough to get this one just right because it is much different than the production MB playfield
|
134
Here they are side by side.The proto and NOS.
The proto has no bevel leading into the hole.The wood border is different
|
135
Final clear applied.
|
136
After is sets up I will lightly sand and polish it.
|
137
Playfield is polished and ready for reassembly.
|
138
Underside has been freshened up.
|
139
T nuts are installed.
|
140
Hole protector installed.
Although the art and bordering are a bit different than the production version(there is no l
|
141
With MB when using the drac trac brace the first thing you need to install is the lamp board and drac motor assembly so y
|
142
Topside rebuild in process.
|
143
|
144
Through parts installed.Underside rebuild in process.
|
145
Wiring is being put in place.
I rebuilt as much of the switch harness as possible during the cleaning phase but there wi
|
146
The underside is mostly populated and roughly wired.
I need everything on there in order to finish up the rework on the
|
147
Now that everything is in place I can figure out how to tap the previously hacked into areas neatly.The following pics
|
148
|
149
|
150
All my wiring is marked and in place.I can now go about the final taps and repairs before wrapping it all up and droppin
|
151
After lots of tracing and rework the wiring issues have been resolved and the playfield is back in the cabinet.Powered up
|
152
|
153
|
154
|
155
Rebuild continues.
|
156
|
157
|
158
|
159
|
160
|