41
Boards all look good nothing too scary just normal service work that will need to be done.
|
42
Playfield is being stripped of all parts.
|
43
Exposing the broken corner from the topside.
|
44
Wear at the ringmaster becomes more obvious.
|
45
Underside is being stripped.
|
46
All wiring removed.
|
47
Parts are categorized and will be gone through one section at a time.
|
48
|
49
|
50
Playfield is stripped complete topside and removed.
|
51
Underside stripped complete.
|
52
This is the replacement playfield.It will need some work and corrections to be up to HEP standards but it is much
|
53
The clear on the replacement will be redone along with a few minor art work corrections .
|
54
Another thing that needs to be done to the replacement is that it needs to be drilled and dimpled so there are hole
|
55
|
56
This is what the area should look like in terms of where it was broken on the original playfield..
|
57
Underside of the new playfield will be drilled and dimpled.
|
58
|
59
Underside is now drilled and dimpled.
|
60
There are hundreds of holes that were needed and drilled.
|
61
|
62
Cabinet is gutted.
|
63
Head gutted.
|
64
Cabinet is nice and solid so I will rework it instead of replacing/building a new one.
|
65
Cabinet is stripped to bare wood and repairs are being made where needed.
|
66
Repairs are complete.
|
67
Floor is sanded as clean as possible.
|
68
Head is stripped and repaired.Face is filled and smoothed for a nicer look.
|
69
|
70
Head is primed.
|
71
Lower is primed.
|
72
Will sand then base in black and clear the cabinet next.
|
73
Replacement playfield will b prepped and minor corrections made.
|
74
Primary concern besides the finish on the playfield is the Join the Circqus insert has a little more insert color tra
|
75
Playfield is sanded.
|
76
The insert concern is masked and based in white.
|
77
The JTC insert now unmasked.
|
78
Playfield is now ready for a few minor tweaks then clear application.
|
79
Head is sanded and prepped for paint.
|
80
Lower prepped for paint.
|