41
Playfield is cleared.
|
42
|
43
Playfield is ready to sand and clear once more.
|
44
Sanded.
|
45
Cleared once again.
|
46
|
47
|
48
That should do it for the clearing portion.
|
49
New lower cabinet.
|
50
Cabinet is built to spec not a one or two size fits all.CP cabinet is specific in the top plate and other areas such
|
51
Lower prepped and ready to prime.
|
52
New head.
|
53
Head primed.
|
54
Lower primed.
|
55
Cabinet and head are being sanded and prepped for paint.
|
56
|
57
|
58
|
59
Painted and cleared.
|
60 head is screened with the rear text
|
61 Cabinet is unmasked and being prepped for decal application.
|
62 Braided new leg plates installed
|
63
|
64
|
65 Ready to decal
|
66
|
67
Cabinet is decaled will finish the edges next.
|
68 cabinet built with chrome trim
|
69
Playfield is sanded and ready to polish.
|
70
Playfield is polished.
|
71
|
72
|
73
|
74
|
75
Playfield is checked for clearance with the mirror blades prior to rebuild in case any modifications are needed first.
|
76
Cabinet is wired.
|
77
New coin door installed.
|
78
Playfield is being assembled.
|
79
|
80
Side rails were plated and now protected to minimize the possibility of scratching he mirror blades.
|