41 Playfield is sanded.
42 The lettering issue is all that is in need of correction after the detailed sanding which removed the solvent pop issue
43 Lettering is corrected.The texture of it right now in this picture may make it look strange but once cleared it will be m
44 New lower cabinet.
45
46
47 New lower prepped for primer.
48 New head prepped for primer.
49 Lower primed.
50 Head primed.
51
52 Sanded and ready to paint.
53
54 Cabinet is prepped and ready to decal.
55 Head decaled.Edges not yet finished.
56 Lower decaled.
57
58 Inner decals installed as requested.
59 Edges will be finished next then rebuild begins.
60 Edges are finished by airbrush connecting the art and duplicating the patterns to give a seamless look.
61 Cabinet protections are put in place at the leg locations.
62 Polished brass trim installed.
63
64 Lower is up on legs now.Will build the head next.
65 Translite panel is torndown,cleaned.
66 Light tub refinished.
67
68 Rebuilt and ready to install when the time comes.
69 Apron was plated.
70 Art is applied to apron.
71 Cabinet is built.
72 New door was needed.
73 Cabinet is neatly wired.
74 Playfield is ready to build.
75 Jumping way ahead now but the playfield is built and in the cabinet.
76
77 Ramps,plastics etc are next and then the game will be complete.
78 Plated sword.
79
80