41
|
42
Ground braid installed.
|
43
Back of the head has been refinished and re-screened with the warning text.
|
44
Cabinet is ready to decal.
|
45
Decals applied.
|
46
|
47
|
48
Playfield repairs begin.
Shooter lane is very rough.It isn't really worn so bad as it is just ugly and worn in a bit.The
|
49
The ball drops and lower switch cut out are chipping and have some ground in dirt.
|
50
|
51
The drop target cut outs have some very minor chipping and the typical ground in dirt for these.
|
52
Mine hole is not too bad but will go into the green during the process and it does have some bordering in that area anyway
|
53
Everything that can sand or clean up has been a thin barrier coat of clear will be put down to hold it all together and beg
|
54
Rough coat of clear is applied.It won't look good as it will be sanded back off for the most part anyway.The purpose is jus
|
55
|
56
The shooter lane will need a thin repaint in order to look good again.Luckily CC has a short lane so it won't be that big a
|
57
Thje switch cut outs and ball drops will also need some refinishing.
|
58
|
59
The drop cut outs will need to be refreshed as well.
|
60
|
61
the initial coat of clear has been sanded.Repairs are in process.
|
62
Many repairs were done but I did not capture many of them because I put my camera down somewhere odd when the phone rang an
|
63
Second coat of clear applied.It came out very nicely so it will probably be the last one.I will take some better close up
|
64
Decals are finished out.
|
65
Cabinet is ready for rebuild.
|
66
|
67
Cabinet rebuild is complete and it is back up on legs.
|
68
the playfield is polished,sanded clean and ready to begin rebuild.
|
69
T nuts are installed.
|
70
Jet bumper bodies in place.
|
71
|
72
Through parts installed.
|
73
|
74
|
75
Underside rebuild begins.
|
76
Flippers were recently rebuilt but I orefer to use the original coils when I can and the new style kits that recently came
|
77
|
78
Flippers rebuilt and in place.
|
79
Switch harness repaired and installed along with most of the looms.
|
80
Lamp harness has been run.All coils have been rebuilt and installed.The solenoid harness is roughly routed but will need so
|