202
203 Now that I am settled with the gloss I will detail the cabinet.Starting with sanding the bottom.
204 Sanded clean.
205 I have installed new ground braid.
206 With a little modification I was able to fit and install the better reinforced leg plates.These strengthen the corners a
207 Lower is p on legs.
208 Head ready for rebuild.
209 Head rebuild in process.
210 Ready to go back on lower.All boards are serviced.
211 Lower rebuild in process.
212 New rails installed.
213 I had to make the extra flipper button hole in the siderail since there are no Bk2k versions available.
214 Head is back on lower.
215 Ready to wire.
216
217 Lower playfield is ready for rebuild.
218
219
220 Lower rebuild in process.
221
222
223 Wiring the underside lower.
224 Lower playfield is back in the cabinet.
225
226 Lower playfield powered up for testing.
227
228
229
230
231 Inserts turned out well.No light gaps.
232 The lamp panel was cleaned up an all new biulbs were installed.
233 Lower plastics are installed.
235
236 Feeling like I am starting all over again.Here is the upper.A little dusty from sitting around but it won't matter in the
237 Teardown in process. I waited to start this because it is an easy bolt on after the rest of the game is in place.In the g
238 Teardown nearly complete.
239 Ready to remove the Mylar.
240 Mylar is removed.Same issues as the lower.Luckily it has far less inserts.
241 As with the lower I will pull each insert out,strip it and reset it.
242 All inserts have been pulled,stripped and reglued/set. Intial clear is next.Hopefully this will go much quicker than