280
|
281
|
281a
|
281b
|
281c
|
282
Powered up for testing.Not much to check here but I can verify the sound is working,the GI stuff I rebuilt and the new dis
|
283
Cabinet is done these are just some pics to highlight it.
|
284
|
285
|
286
|
287
|
288
|
289
I will be starting the lower playfield next.
The order I am using is the order the game assembles in.
|
290
Lower playfield teardown in process.
|
291
|
292
|
293
All harnesses removed for cleaning and rebuild.
|
294
|
295
All parts removed top and bottom.There is some minor wear and insert bordering nothing major.
|
296
The playfield is just about ready to start the rework process.First off I need to pull the stapled in braid and sockets.
|
297
Braid and sockets removed.The path was traced.
|
298
Playfield is ready to prep for the initial clear.
|
299
The shooter lane will sand up nicely ther s some cracking starting in the shooter lane exit.This area is very weak on som
|
300
Shooter lane sanded.
|
301
The hole is just a little splintered and discolored.I will sane it up best I can right now then seal it with clear before
|
302
This is as clean as it comes without mis-shaping it.
|
303
Ready to clear.
|
304
First clear applied.
|
305
the hole should be solid now.On the next phase I will sand it up one more time and refinish it.
|
306
After this sets a couple days I will sand it back down do the repaints and clear it again.
|
307
while I wait for the lower t set up I will begin the upper.I want it to time out just about a week behind the lower for a
|
308
Teardown in process.It will need a new trough and targets.
|
309
|
310
Topside needs to teardown next.Much of the hardware is frozen on s it will reqiuire that stuff to be drilled off and repl
|
311
Underside teardown complete.
|
312
Topside teardown complete.The playfield has been thoroughly cleaned as well.There are some raised inserts with wear,scre
|
313
Playfield is prepped for the first coat of clear.
|
314
Clear applied.The inserts will need some work along with some repaints but it is not too bad.
|
315
Lower playfield is ready to sand and prep for the next clear.cd
|
316
Lower resanded.
|